SCADA - 140,000PE Sewerage Treatment Plant (STP) Batu Berendam Melaka JPP

SCADA - 140,000PE Sewerage Treatment Plant (STP) Batu Berendam Melaka JPP

Overview - 140,000PE Sewerage Treatment Plant SCADA System

Flow Solution was awarded a contract to supply, install, and commission a SCADA system for the JPP Batu Berendam Sewerage Treatment Plant, allowing for monitoring and control of the plant's processes and equipment. The system will improve overall efficiency and reduce the need for manual intervention. The project includes nine buildings, and the SCADA HMI includes various pages for monitoring and controlling the plant's equipment and processes.

System Layout

image
image

Things used in this project

Hardware Components

Server Workstation
Dell OptiPlex 7060
1
Client Workstation
Dell OptiPlex 3050
1
Notebook
Dell Vostro 5471
1
60” Full HD LED TV
Sharp LC60UA6800X
1
Digital Colour Laser Printer
HP MFP M177fw
1
Black Laser Printer
HP MFP M177fw
1
3G Router
Linksys Router G2111
1
Ethernet Switch
HP-1910
1
UPS
Right Power Titan Neo P10K
1

Software apps and online services

Schneider CITECTSCADA
1

Story

Flow Solution was awarded the contract to supply, install, and commission a SCADA system for the JPP Batu Berendam Sewerage Treatment Plant. The system will allow for monitoring and control of the plant's processes and equipment. This will improve overall efficiency and reduce the need for manual intervention. There are total 9 buildings:

Instrumentation

Facilities

Overall layout

image
image

Admin Building

image

Return Waste Sludge Pump Room

image
image

Sludge Treatment Building

image
image

Chlorine Chemical Building

image
image

EA Tank

image
image

Aerated Grit and Grease Chamber

image
image

Main Inlet Pump Station Building

image
image

Consumer LV Switchboard Room

image
image

Consumer HT Switchgear Room

image
image

SCADA HMI

VENTILATION FAN OPERATING STATUS PAGE

image

ACTUATOR HOUR RUN RECORD SUMMARY PAGE

image

MCC PANELS STATUS PAGE

image

DPM STATUS PAGE

image

ACTIVE ALARM PAGE

image

HISTORICAL SUMMARY PAGE

image

INSTRUMENT DATA TREND PAGE

image

Training

Day 1
Day 2
Day 3
Day 4
Day 5